ggsurveillance logo

CRAN status Download Lifecycle R-CMD-check Codecov test coverage

ggsurveillance is an R package with helpful tools and ggplot extensions for epidemiology, especially infectious disease surveillance and outbreak investigation. All functions provide tidy functional interfaces for easy integration with the tidyverse. For documentation and vignettes see: ggsurveillance.biostats.dev

Key Features

📊 Epidemic Curves

📅 Date & Time Transformations

📈 Specialized Epi Visualizations

🎨 ggplot2 Extensions & Theme Modifications

🔧 Other Utilities

Examples

Creating Epicurves

library(ggplot2)
library(tidyr)
library(outbreaks)
library(ggsurveillance)

sars_canada_2003 |> #SARS dataset from outbreaks
  pivot_longer(starts_with("cases"), 
               names_prefix = "cases_", 
               names_to = "origin") |>
  ggplot(aes(x = date, weight = value, fill = origin)) +
  geom_epicurve(date_resolution = "week") +
  geom_epicurve_text(aes(label = ifelse(origin == "travel", "🛪", "")), 
                     date_resolution = "week", size = 1.5, color = "white") + 
  scale_x_date(date_labels = "W%V'%g", date_breaks = "2 weeks") +
  scale_y_cases_5er() +
  scale_fill_brewer(type = "qual", palette = 6) +
  theme_classic()
Epicurve of the 2003 SARS outbreak in Canada

Align surveillance data for seasonal comparison

library(ggplot2)
library(dplyr)
library(ggsurveillance)

influenza_germany |>
  filter(AgeGroup == "00+") |>
  align_dates_seasonal(dates_from = ReportingWeek,
                       date_resolution = "isoweek",
                       start = 28) -> df_flu_aligned

ggplot(df_flu_aligned, aes(x = date_aligned, y = Incidence)) +
  stat_summary(
    aes(linetype = "Historical Median (Min-Max)"), data = . %>% filter(!current_season), 
    fun.data = median_hilow, geom = "ribbon", alpha = 0.3) +
  stat_summary(
    aes(linetype = "Historical Median (Min-Max)"), data = . %>% filter(!current_season), 
    fun = median, geom = "line") +
  geom_line(
    aes(linetype = "2024/25"), data = . %>% filter(current_season), colour = "dodgerblue4", linewidth = 2) +
  labs(linetype = NULL) +
  scale_x_date(date_breaks = "month", date_labels = "%b'%Y", 
               guide = guide_axis_nested_date()) +
  theme_bw() +
  theme_mod_legend_position(position.inside = c(0.2, 0.8))
Seasonal influenza data from Germany by age group

Create Epigantt plots to visualize exposure intervals in outbreaks

library(dplyr)
library(tidyr)
library(ggplot2)
library(ggsurveillance)

# Transform to long format
linelist_hospital_outbreak |>
  pivot_longer(
    cols = starts_with("ward"),
    names_to = c(".value", "num"),
    names_pattern = "ward_(name|start_of_stay|end_of_stay)_([0-9]+)",
    values_drop_na = TRUE
  ) -> df_stays_long

linelist_hospital_outbreak |>
  pivot_longer(cols = starts_with("pathogen"), values_to = "date") -> df_detections_long

# Plot
ggplot(df_stays_long) +
  geom_epigantt(aes(y = Patient, xmin = start_of_stay, xmax = end_of_stay, color = name)) +
  geom_point(aes(y = Patient, x = date, shape = "Date of pathogen detection"), data = df_detections_long) +
  scale_y_discrete_reverse() +
  theme_bw() +
  theme_mod_legend_bottom()
Epigantt chart of a fictional hospital outbreak

Create Diverging Bar Charts

Useful for population pyramids, vaccination status, likert scales (sentiment) etc.

library(dplyr)
library(ggplot2)
library(ggsurveillance)

population_german_states |>
  filter(state %in% c("Berlin", "Mecklenburg-Vorpommern"), age < 90) |>
  ggplot(aes(y = age, fill = sex, weight = n)) +
  geom_bar_diverging(width = 1) +
  geom_vline(xintercept = 0) +
  scale_x_continuous_diverging(n.breaks = 7) +
  facet_wrap(~state, scales = "free_x") +
  theme_bw() +
  theme_mod_legend_top()
Population pyramids of Berlin and Mecklenburg-Vorpommern